One of the most recent prestigious projects we at Protek Interiors have worked on is the transformation of the Olympic stadium, working for the main contractor Balfour Beatty.
While the stadium itself had passed rigorous fire safety checks ahead of the 2012, the change of use and amendments to its layout and pitch meant that further assessment and upgrades of the passive fire protection systems were required.
We did the following:
- Carried out a full fire risk assessment of the stadium to identify any potential new risks and hazards, as well as existing passive fire protection systems that needed repair or maintenance
- Recommended solutions to mitigate against the risk of fire in the stadium
- Installed new passive fire protection measures in order to ensure the fire risks were fully minimised and the safety of everyone using the stadium could be assured.